What does RED NAR actually do?
RED NAR prepares electrical systems off-site based on approved residential plans.
Systems are delivered organized, labeled and ready for installation.
Contractors receive:
• a pre-assembled electrical panel
• identified and prepared cable assemblies
• Organized components aligned with the plans
Everything is prepared to reduce on-site work.
Cable Length Tolerance
Cable lengths include a controlled allowance (typically 10–15%) to accommodate on-site adjustments while maintaining proper installation.
All components are certified for the Canadian market.
Installation and inspection follow standard electrical regulations and remain unchanged.
Preparation time depends on project size.
Systems are delivered aligned with the construction schedule.
RED NAR reduces on-site work by preparing electrical systems in advance.
This results in:
Faster installation
Reduced labor requirements
Better project predictability
The system remains fully compliant and installed by licensed electricians.
The system is designed for residential projects, including:
• single-family homes
• multi-unit residential buildings
• modular and prefabricated housing
It delivers the highest value in projects with repeated layouts or multiple units.
Yes. Each system is prepared based on the specific electrical layout of the project.
Final installation is always performed by licensed electricians on site.
No. RED NAR works with licensed electricians — it does not replace them.
Projects can be reviewed based on electrical plans to evaluate feasibility and expected benefits.
Who is responsible if there is an issue with the electrical system?
RED NAR prepares the system.
Installation, testing and approval remain under the responsibility of licensed electricians and local authorities.
Will using RED NAR affect the construction schedule?
No. RED NAR aligns with the construction schedule and reduces on-site preparation time.